





|
| Length |
|
| Between perpendiculars (LBP) |
194.00' |
| Overall (LOA) |
224' |
| |
|
| Beam and Depth |
|
| Molded Beam |
43.00' |
| Depth to Main Deck, Molded |
20.00' |
| Bulkhead Deck |
Main Deck |
| |
|
| Load Line |
|
| Draft |
14" 11' |
| Displacement |
2,262 LTON |
| |
|
| Speed |
11 kts (12.65 mph) |
| |
|
| Light Ship |
|
| Displacement |
1,433 LTON |
| VCG (ABL) |
22.20' |
| LCG (Aft of FP) |
96.94' |
| Mean Draft, Keel |
11.11' |
| |
|
| Capacities |
|
| Fuel Oil (95%) |
386.9 LTON |
| Lube Oil (95%) |
35.1 LTON |
| Sea Water Ballast (100%) |
678.5 LTON |
| Potable Water (100%) |
18.9 LTON |
| Effluent Holding |
166.4 LTON |
| US Gross Tonnage |
1471.8 |
| |
|
| Deck Heights |
|
| Lower Deck |
14' 0" |
| Main Deck |
20' 0" |
| Forcastle Deck |
31' 11 5/8" |
| Upper Deck |
40' 2 5/8" |
| Bridge Deck |
49' 2 5/8" |
| |
|
| Power Plant |
|
Diesel-electric; 4 Caterpillar D 398 diesel generators,
3,200hp, 2 motors, 1,600hp; 2 shafts; bow thruster; 550 hp |
|
| Underway Fuel Consumption |
100 gal/hr |
| Not underway "Hotel Functions" |
25 gal/hr |
| |
|
| Crew |
|
| 15 Officers/crew, 2 Instructors, 50 Cadets (38
to 69) |
|